{"id":81,"date":"2019-02-18T22:52:05","date_gmt":"2019-02-18T22:52:05","guid":{"rendered":"http:\/\/appliedconnections.com.au\/wp\/?p=81"},"modified":"2019-02-18T23:15:31","modified_gmt":"2019-02-18T23:15:31","slug":"project-engineer-indra-australia-april-2017-mid-march-2018","status":"publish","type":"post","link":"http:\/\/appliedconnections.com.au\/wp\/?p=81","title":{"rendered":"Project Engineer &#8211; Indra Australia &#8211; April 2017 \u2013 mid March 2018"},"content":{"rendered":"\n<p>The PNGASL HF Aeronautical\nCommunication System and Associated Works project has a requirement for the\nCivil Design component. &nbsp;The project design documentation is divided into\n4 components:<\/p>\n\n\n\n<ul><li>Civil Design <\/li><li>Electrical Design <\/li><li>Radio Design <\/li><li>Network\nDesign <\/li><\/ul>\n\n\n\n<p>The Detailed Design and\nassociated documents for the above 4 components fulfil the design requirements\nof Critical Design Review (CDR).<\/p>\n\n\n\n<p>My role as Project engineer was to complete CDR, deliver all\ndesign documents for approval and issue of For Construction Drawing sets.\n\nThis engagement finished when the customer\ndisputed the technical aspect of the project.\n\n\n\n<\/p>\n\n\n\n<p><strong>I<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The PNGASL HF Aeronautical Communication System and Associated Works project has a requirement for the Civil Design component. &nbsp;The project design documentation is divided into 4 components: Civil Design Electrical Design Radio Design Network Design The Detailed Design and associated documents for the above 4 components fulfil the design requirements of Critical Design Review (CDR).<a href=\"http:\/\/appliedconnections.com.au\/wp\/?p=81\">[&#8230;]<\/a><\/p>\n","protected":false},"author":2,"featured_media":90,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=\/wp\/v2\/posts\/81"}],"collection":[{"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=81"}],"version-history":[{"count":2,"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=\/wp\/v2\/posts\/81\/revisions"}],"predecessor-version":[{"id":86,"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=\/wp\/v2\/posts\/81\/revisions\/86"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=\/wp\/v2\/media\/90"}],"wp:attachment":[{"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=81"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=81"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/appliedconnections.com.au\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=81"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}